Pandrol: The trusted names in rail infrastructure have joined forces. The power of One. Find out More.

DTL2 Singapore Now Open

January 21, 2016

DTL2 Construction

In Singapore, the latest addition to the MRT network was opened on 27th December 2015.  The new line is the second phase of the Downtown Project which, when fully complete in 2017, will be the longest driverless MRT line in the world at 42km in length.

The entire line is fitted with the Pandrol DFC Fastening System which has been in satisfactory service on the Singapore MRT since 2001. A total of 109,000 fastening systems were supplied to Alstom who installed all the trackwork on Phases 1 and 2 of the Downtown Line between 2011 and 2014.